• Full Automatic Nonwoven Bouffant Cap Macking Machine for Factory/Hospital
  • Full Automatic Nonwoven Bouffant Cap Macking Machine for Factory/Hospital
  • Full Automatic Nonwoven Bouffant Cap Macking Machine for Factory/Hospital
  • Full Automatic Nonwoven Bouffant Cap Macking Machine for Factory/Hospital
  • Full Automatic Nonwoven Bouffant Cap Macking Machine for Factory/Hospital
  • Full Automatic Nonwoven Bouffant Cap Macking Machine for Factory/Hospital

Full Automatic Nonwoven Bouffant Cap Macking Machine for Factory/Hospital

Warranty: 1year
Application: Nonwoven Cap
Automatic Grade: Automatic
Certification: CE, ISO9001: 2000
Customized: Customized
Condition: New
Samples:
US$ 0.1/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2010

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
ALT-500
After-sales Service
1year
Transport Package
Wooden Case
Trademark
ALT
Origin
China
HS Code
8451800090
Production Capacity
100PCS/Min

Product Description

Full Automatic Nonwoven Bouffant Cap Macking Machine for Factory/Hospital
Full Automatic Nonwoven Bouffant Cap Macking Machine for Factory/Hospital
 
Full Automatic Nonwoven Bouffant Cap Macking Machine for Factory/Hospital
Full Automatic Nonwoven Bouffant Cap Macking Machine for Factory/Hospital
 
Full Automatic Nonwoven Bouffant Cap Macking Machine for Factory/Hospital
Full Automatic Nonwoven Bouffant Cap Macking Machine for Factory/Hospital


A  Process Description :
Elastic, non-woven fabric feeding--Edge Folding--shaping--Welding
--cutting------packing



Material: non-woven fabric(10g-15g) ,material roll width: 48cm 
elastic: double elastic or single elastic
packing: plastic bag, 100pcs/bag

B  Technical Parameter :
Supply Power: AC380V  50HZ
Power : 9kw
Speed : 0-100pcs/minute
Dimensions : 7200*1500*1500mm(L*W*H)
Net Weight:1000kg
C   Operating Program
1.Adjust the non-woven fabric plate and tension equipment.
2.Pull the non-woven fabrics into folding and welding manually.
3. Elastic feeding and pull into the Ultrasonic welding.
4.Open the main machine slowly, then start to welding and cutting.
D. INSTRUCTIONS:
  1. Ultrasonic : 3sets  (Shangrong)
  2. Motor: TaiWan "YongKun"
3.Touch screen: TaiWan "Wei- Lun"
4.Inverter: TaiWan "Sunfar"
5.PLC: Japan "Mitsubishi"
6.Sensor: Japan"OMRON"
7.servo motor: 8 sets(delta)
8. servo reducer:8 sets(delta)
9.Cylinder: Airtac
10. The electromagnetic valve: Airtac
11. conveyor belt:1 pcs

E    Maintenance
    1.Please start the ultrasonic welding equipment before open the main machine to avoid the superimposed load damage the ultrasonic equipment.
2.Adjust the ultrasonic mould pressure, too big may burnout it,too small may press unwell.
3.The pulling should be in balance when elastic feeding, or it may folding unwell.

F    Advantages
      1.This machine has aluminum alloy rack and will not get rusted permanently.
      2.It's touch-operated.
      3.With imported brake and motor,it has low noise.
      4.With ultrasonic welding, automatically controls tension.
      5.With no manual operation from feeding materials.

 Payment: After 30% of the total value is paid in advance by (T/T), The left 70% 
should be paid by (T/T) after you check up the finished machine. And the cargo 
will be delivered after all the payment arrives at our account.
Delivered time: 60days 
Package: Wooden packing
Warrant term: 1 year 
Installation and test: The buyer should pay the round tickets, visa fee, food and accommodation in your country and our engineers $80 per day if you need our training and installation abroad.
Zhangjiagang city ALT machinery co.,ltd
 
 
Russian website:www.alaite.ru
English Website: alaite.en.made-in-china.com
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2010

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
18
Year of Establishment
2009-02-25